Things tagged 'consultation'

limited to the area of Tower Hamlets Wheelers:

58 issues found for 'consultation':

  • Bow (Harley Grove / Central Foundation Girls' School area) traffic calming

    Created by Alex Jenkins // 1 thread

    Proposed new one-way streets, banned turns, and kerb build-outs in the vicinity of Central Foundation Girls' School in Bow (the measures affect Coborn Street, Harley Grove, Alfred Street and Benworth Street).

    Consultation page is here:
    https://www.pclconsult.co.uk/projects/harley-grove/

    PDF plan of the proposals is here:
    https://www.pclconsult.co.uk/wp-content/uploads/2018/06/HG-CON-with-signs-v1.pdf

    Please sign in to vote.
  • 60-70 St Mary Axe

    Created by Simon Munk // 1 thread

    City of London Corporation says:
    The site bounded by Bevis Marks, Goring Street, Houndsditch and St. Mary Axe is being redeveloped as a new office building known as 60-70 St. Mary Axe and nicknamed ‘The Can of Ham’. The new development has provided the city Corporation with the opportunity to review the use of that section of St. Mary Axe and in particular its use by pedestrians.
    The Citywide Pedestrian Model has indicated that this section of St. Mary Axe will become a major pedestrian desire line linking the Eastern City Cluster with the new Crossrail (Elizabeth line) station at Liverpool Street and that pedestrian numbers at peak times will double by 2026. In view of this, the City Corporation is proposing to close the street to motor vehicles to create a pedestrian and cycle route. Closing St. Mary Axe requires the payment parking place to be relocated to Cutler Street. As Cutler Street is one-way with contra-flow cycling, the new parking will consist of two parking places with two parking bays in each to allow a passing place halfway down the street.
    Currently, St. Mary Axe provides a diversion route for bus services when required and in order to maintain a diversion route, Goring Street will be used as the alternative. This requires the one-way traffic restriction to be reversed and the disabled persons parking places relocated to Houndsditch. To ensure that buses can exit the street, a length of ‘at any time’ loading restrictions will be introduced in Bevis Marks opposite Goring Street. To allow buses to make the turn into Goring Street, the parking bays on the opposite side in Houndsditch will be relocated to the south-west side. Double yellow line ‘at any time’ waiting restrictions will be introduced at both ends of Goring Street.
    Goring Street has an entry table at its junction with Bevis Marks but with the traffic flow being reversed, a new entry table is being proposed at the junction with Houndsditch. The existing entry table will be retained as it provides a step free route for pedestrians along Bevis Marks.
    The pedestrian crossing in Bevis Marks near the junction with St. Mary Axe is being moved north-westward to be closer to the pedestrian desire line and widened to allow for an increase in pedestrian numbers. The pedestrian crossing at the other end of St. Mary Axe in Houndsditch will have the ‘no stopping’ zig-zag markings amended to facilitate relocating the remaining parking place from the north-east side to the south-west side so that all parking in Houndsditch is on the same side of the street.

    Please sign in to vote.
  • Proposals for the Creation of a Major Road Network (London)

    Created by Simon Munk // 1 thread

    From the DfT:
    As part of the Transport Investment Strategy, the government committed to creating a Major Road Network (MRN).

    This consultation asks for views on:
    how to define the MRN
    the role that local, regional and national bodies will play in the MRN investment programme
    which schemes will be eligible for MRN funding

    A new MRN would help deliver the following objectives:
    reduce congestion
    support economic growth and rebalancing
    support housing delivery
    support all road users
    support the Strategic Road Network

    The creation of an MRN will allow for dedicated funding from the National Roads Fund to be used to improve this middle tier of our busiest and most economically important local authority ‘A’ roads.

    Please sign in to vote.
  • Cheshire Street area improvements

    Created by Alex Jenkins // 1 thread

    The consultation page states "A review of the Cheshire Street North 20mph zone has been undertaken and a number of improvements have been suggested making the roads safer and encouraging more walking and cycling in the area. The proposals include new cycle facilities, a one-way system on Wood Close, road closures and new crossings, as well as planting new trees in the area."
    Link here: https://www.pclconsult.co.uk/projects/cheshire-street/

    Please sign in to vote.
  • Canary Wharf South Dock Bridge consultation

    Created by Alex Jenkins // 1 thread

    The Tower Hamlets consultation page states "We are consulting on a proposed new pedestrian and cycle bridge to connect Canary Wharf and the Isle of Dogs, called South Dock Bridge. An earlier study has shown that the bridge should align with Upper Bank Street on the north bank of the South Dock and the Berkeley Homes 'South Quay Plaza' scheme on the south bank."

    Consultation closes 23 March.

    Link here: https://www.towerhamlets.gov.uk/lgnl/council_and_democracy/consultations/South_Dock_Bridge_consultation.aspx#ad-image-0

    Please sign in to vote.
  • New London Plan 2017

    Created by Simon Munk // 1 thread

    London.gov.uk says:

    What is the new London Plan?
    The London Plan is one of the most important documents for this city.
    It's a strategic plan which shapes how London evolves and develops. All planning decisions should follow London Plan policies, and it sets a policy framework for local plans across London.
    The current 2016 consolidation Plan is still the adopted Development Plan. However the Draft London Plan is a material consideration in planning decisions. It gains more weight as it moves through the process to adoption, however the weight given to it is a matter for the decision maker.

    Consultation on the draft London Plan
    Consultation on this plan is open. Comments will be publicly available. After the consultation, comments are reviewed by an inspector and you may be called in to discuss comments at the Examination in Public.

    What is an Examination in Public?
    At the end of the consultation period your comments will be reviewed by the independent Planning Inspector appointed by the Secretary of State to carry out the Examination in Public for the London Plan.
    You may be invited to discuss your comments at the Examination in Public. All comments will be made available to the public at the end of the consultation period. The legal provisions for the London Plan are in Part VIII of the Greater London Authority (GLA) Act 1999 (as amended) in sections 334 to 341. The Examination in Public is covered in Section 338.

    Please sign in to vote.
  • Heavy Goods Vehicles Safety Standard Permit /Direct Vision Standard

    Created by Simon Munk // 1 thread

    Tfl says:

    We have undertaken research that shows that in 2015, Heavy Goods Vehicles (HGVs) were involved in disproportionately high numbers of fatal collisions with cyclists (78 per cent) and pedestrians (20 per cent) on London’s streets, despite only making up four per cent of the overall miles driven in the Capital. The Direct Vision Standard (DVS) forms part of The Mayor, Sadiq Khan and TfL’s Vision Zero approach to reducing road danger. The DVS categorises HGVs on the level of the driver’s direct vision from the cab.

    We consulted earlier this year on the principles of a new DVS. Listening to the feedback from this consultation and working closely with industry and stakeholders we have now further developed this scheme. The Consultation report and Responses to Issues Raised document from this first phase of consultation are available to view in from the links at the bottom of this text. The responses showed that, in general, there is support for the principle of a Direct Vision Standard.

    We are now seeking your views on proposals to introduce a new Safety Standard Permit Scheme as part of DVS which widens our approach beyond direct vision and includes a safe system approach to allow us to address a broader range of road danger risks.

    The proposed scheme would require all HGVs over 12 tonnes to hold a Safety Permit to operate in Greater London from 2020. HGVs will be given a rating between ‘zero-star’ (lowest) and ‘five-star’ (highest). Only those vehicles rated ‘one star’ and above would be allowed to enter of operate in London from 2020. Zero rated vehicles would only be allowed if they can prove compliance through safe system measures. By 2024 only ‘three-star’ rated HGVs and above would automatically be given a Safety Permit. HGVs rated two star and below would need to demonstrate increased safety through progressive safe system measures.

    The safe system could include specific industry recognised measures such as sensors, visual warnings and comprehensive driver training. The Safety Standard Permit scheme would evolve over time, taking into account advances in technology.

    Detailed information about the scheme and the approach in which we have arrived at our current proposals are set out in the consultation document. A full Integrated Impact Assessment is also included.

    The consultation approach
    We are undertaking a phased consultation approach at key stages of the development of the consultation proposals to implement the Direct Vision Standard:

    Phase 1 (24 January to 18 April 2017) – we set out the case for HGV driver direct vision and consulted on the Mayor of London’s outline proposals to introduce a Direct Vision Standard for HGVs in London and the principles of the Standard itself. The responses showed that, in general, there is support for the principle of a Direct Vision Standard.

    Phase 2a – policy consultation (this consultation) – this current phase of consultation seeks views and feedback on the scheme proposals as outlined above and within the supporting consultation document which includes supporting technical reports including the full Integrated Impact Assessment. Feedback from this phase of consultation will be used to develop a second IIA and finalise the scheme proposals to be included in phase 2b of the consultation.

    Phase 2b - Final scheme proposals and statutory consultation (Spring/Summer 2018) – this final phase will consult on the final proposals for the HGV Safety Standard Permit Scheme, including statutory consultation on the appropriate regulatory measure to ban or restrict HGVs in London under the scheme, subject to UK Government and European Commission support and notification.

    Please sign in to vote.
  • London Assembly cycling infrastructure investigation

    Created by Simon Munk // 1 thread

    London Assembly says:

    Our investigation
    Over recent years, TfL policy has increasingly focused on the construction of physical cycling infrastructure on London’s roads. A change in direction towards more segregated infrastructure followed our report in 2012 recommending this approach.

    Our investigation will cover the full range of cycling infrastructure in London, with a particular focus on:

    Cycle Superhighways: a form of cycle lane, designed to make cycling safer by helping keep cyclists away from general traffic, and offer direct and continuous cycling on major routes.

    Quietways: a network of cycle routes that link key destinations, improving safety and convenience through small-scale interventions.

    Mini-Hollands: TfL schemes to invest neighbourhood-level improvements in walking and cycling, involving a range of interventions in each area.

    Cycle parking: provision of parking spaces on-street, at stations or in dedicated parking facilities.

    It is important that TfL is able to establish the effectiveness of the infrastructure it installs on London’s roads. We are concerned that to date there has been no comprehensive study of the new infrastructure’s impact on cycling safety, modal share and other road users.

    Questions to answer:

    1. What progress on new cycling infrastructure has been made under Sadiq Khan, and what are his long-term plans?
    2. Has TfL resolved the problems that delayed some cycling schemes under the previous Mayor?
    3. Has segregation delivered the anticipated benefits on the Cycle Superhighways? How many cyclists are using these routes?
    4. To what extent has segregation had negative consequences for other road users and, if necessary, how can this be mitigated?
    5. Have Quietways delivered their anticipated benefits? How many cyclists are using them?
    6. What are the differences in infrastructure between inner and outer London? How can TfL ensure infrastructure in different areas is sufficient and appropriate to the location?
    7. How will TfL’s new ‘Strategic Cycling Analysis’ help determine where and how to invest in infrastructure?
    8. How appropriate is the 400-metre target set in the draft Transport Strategy? Can we equate proximity with access?
    9. Is TfL’s approach to public engagement working effectively to improve scheme designs and meet stakeholder needs?
    10. Are Londoners sufficiently aware of the cycling infrastructure available to them, and how can awareness be increased?
    11. How is TfL using infrastructure to attract a more diverse range of people to cycle in London?
    12. Is there sufficient cycle parking in London, and is it in the right locations?
    13. How are the lessons of the Mini-Hollands and other previous cycling schemes being applied elsewhere?
    14. Should cycling infrastructure be oriented toward longer-distance commuting journeys, or more localised trips?

    Please sign in to vote.
  • London Assembly investigation: Walking & Cycling at Outer London Junctions

    Created by Simon Munk // 1 thread

    London Assembly says:

    Our investigation
    What different approaches could TfL and London boroughs take to improve junctions and increase walking and cycling in Outer London?

    Small pockets of improvement don’t change the fact that most London streets are dominated by traffic and noise. They are hostile places even to step out into for a pint of milk.

    On behalf of the London Assembly Transport Committee, Caroline Russell AM is investigating how our streets and junctions can become more people-friendly.

    Get involved
    There are a number of specific questions the Committee is seeking to answer. Please address any questions where you have relevant views and information to share, and feel free to cover any other issues you would like the Committee to consider.

    Are there lessons to be learned from previous junction improvements?

    How can we enable more people to walk and cycle?

    How can we make our streets and junctions less hostile to people getting around by bike and on foot?

    How do you get all road users on board?

    Please email transportcommittee@london.gov.uk by August 11 and share the investigation on Twitter using #OuterLondonJunctions

    Key Facts
    The Mayor and TfL are promoting walking and cycling as a form of active travel and a way to reduce health inequalities - however, currently, over 40 percent of Londoners fall short of the recommended 150 minutes of activity per week.

    TfL research has found that people who live in Outer London tend to walk less than those who live in Inner London. Public transport coverage is lower and car ownership is higher in Outer London, with cars making up a larger share of journeys. In particular, people who live in Outer London are less likely to walk children to school, walk to see friends or relatives, and walk to pubs, restaurants and cinemas.

    In 2015:
    53 percent of Inner Londoners walked at least five journeys a week, compared to 35 percent of Outer Londoners
    47 percent of Inner Londoners walked as part of longer journeys on other forms of transport at least five times a week, compared to 41 percent of Outer Londoners

    Please sign in to vote.
  • London Assembly Transport Committee Bus network design, safety

    Created by Simon Munk // 1 thread

    London Assembly said:
    "Buses are the busiest form of public transport in London. The city has 675 bus routes, with around 9,000 buses in operation and over 19,000 bus stops. Approximately 2.5 billion bus passenger trips are made every year, around double the number made on London Underground.
    "TfL commissions private operators to run bus services in London, awarding seven-year contracts to operate bus routes. Although bus safety (in terms of casualty numbers) has improved over recent years, there was a spike in bus collision fatalities in 2015.
    "The London Assembly Transport Committee is investigating two aspects of bus services in London: Network Design and Safety."

    Please sign in to vote.
  • Mayor's Transport Strategy

    Created by Simon Munk // 1 thread

    Draft Mayor's Transport Strategy 2017
    On June 21 Mayor of London, Sadiq Khan, published a draft of the Mayor's Transport Strategy. The document sets out the Mayor’s policies and proposals to reshape transport in London over the next 25 years.

    About the strategy

    Transport has the potential to shape London, from the streets Londoners live, work and spend time on, to the Tube, rail and bus services they use every day.

    By using the Healthy Streets Approach to prioritise human health and experience in planning the city, the Mayor wants to change London’s transport mix so the city works better for everyone.

    Three key themes are at the heart of the strategy.

    1. Healthy Streets and healthy people
    Creating streets and street networks that encourage walking, cycling and public transport use will reduce car dependency and the health problems it creates.

    2. A good public transport experience
    Public transport is the most efficient way for people to travel over distances that are too long to walk or cycle, and a shift from private car to public transport could dramatically reduce the number of vehicles on London’s streets.

    3. New homes and jobs
    More people than ever want to live and work in London. Planning the city around walking, cycling and public transport use will unlock growth in new areas and ensure that London grows in a way that benefits everyone.

    Please sign in to vote.
  • Arbour Square, Senrab Street and Head Street

    Created by Alex Jenkins // 1 thread

    CONSULTATION RUBRIC:

    We have reviewed the original design based on feedback from residents, for example:

    You told us the proposed road closure on Senrab Street will lead to a loss of residential parking, so we have moved the road closure to the eastern end of Antill Terrace, which will still reduce the potential for antisocial driving but with less impact on parking.
    You asked for more traffic calming measures on East and West Arbour Streets to prevent antisocial driving, so we propose to introduce flat-topped humps along both these roads and narrow both ends of East Arbour Street.
    Forty one per cent of residents disagreed with the one-way changes so we will not be going ahead with this on Head Street and Senrab Street.
    You said that the proposal for angular parking would lead to antisocial behaviour and visibility issues so we will keep the existing parking arrangement.

    https://www.pclconsult.co.uk/projects/arbour-square-senrab-street-and-head-street/
    Deadline: 17 July 2017

    Please sign in to vote.
  • Salmon Street Road Closure

    Created by Alex Jenkins // 1 thread

    In order to make the road safer for children attending Sir William Burrough School, we propose to:

    Close off Salmon Street to vehicles
    Introduce a zebra crossing to make crossing the road safer
    Design Salmon Street as a public space with raised surface
    Extend the raised table at the Salmon Street / Salmon Lane junction to encourage vehicles to slow down
    Provide a part-time loading bay space for business and school use.

    https://www.pclconsult.co.uk/projects/salmon-street-road-closure/
    Deadline: 30 July 2017

    Please sign in to vote.
  • Smithy Street

    Created by Alex Jenkins // 1 thread

    We have reviewed the original design based on feedback from residents, for example:

    You told us pedestrian safety outside Smithy Street School is a priority, so we are proposing to implement a one-way system, narrowing part of the road, on Smithy Street which will make it easier to cross the road.
    You said there is congestion and parking issues at school drop-off times on Smithy Street. The proposed one-way system will prevent vehicles from turning round and blocking the road, so traffic should flow much better.
    You told us reckless driving is an issue in the area, the one-way system and narrowing part of the road aims to reduce vehicle speed at all times.
    You asked us to improve cycle facilities in the Redman’s Road area, as part of this we are allowing contra-flow cycling on Smithy Street.

    https://www.pclconsult.co.uk/projects/smithy-street/
    Deadline: 23 July 2017

    Please sign in to vote.
  • Antill Road area

    Created by Alex Jenkins // 1 thread

    Tower Hamlets Council is consulting people in the Antill Road area on proposed speed-reducing measures to support the 20mph scheme.

    The proposal supports the London Mayor’s “Safe Streets for London” strategy, and the Council’s commitment to reduce the number of collisions and injuries on London’s roads, as well as make the streets better places to walk and cycle.

    https://www.pclconsult.co.uk/projects/antill-road-area/
    Deadline: 23 July 2017

    Please sign in to vote.
  • Ben Jonson Road / Harford Street / Aston Street junction

    Created by Alex Jenkins // 1 thread

    CONSULTATION RUBRIC:

    Three collisions have occurred at the Ben Jonson/Harford Street/Aston Street junction over a three year period resulting in three slight collisions including a pedestrian hit on the zebra crossing.

    Improving road user behaviour is key to reducing collisions and although changes in layout can’t fully resolve this, redesign of our streets can help.

    The Ben Jonson/Harford Street/Aston Street junction is currently being invested in to improve the safety of the junction and the environment you live in.

    We propose to:

    Introduce traffic lights at the existing give-way junction to make it safer for pedestrians to cross.
    Implement a pedestrian only stage at the junction – this means all traffic lights will be held on red to road users to allow pedestrians to cross the junction safely.
    Remove the zebra crossing as the new traffic lights will provide a safer crossing facility.

    https://www.pclconsult.co.uk/projects/stepney-way-and-sidney-street-junction-2/

    Please sign in to vote.
  • Stepney Way and Sidney Street junction

    Created by Alex Jenkins // 1 thread

    CONSULTATION RUBRIC:

    Three collisions have occurred at the Stepney Way / Sidney Street junction over a three year period causing four slight injuries. All three collisions occurred due to failing to look properly when turning out of the junction or hitting a vehicle in front.

    Improving road user behaviour is key to reducing collisions and although changes in layout can’t fully resolve this, redesign of our streets can help.

    The Stepney Way/Sidney Street junction is currently being invested in to improve the safety of the junction and the environment you live in.

    We propose to:

    Introduce traffic lights at the existing give-way junction to make it safer for pedestrians to cross.
    Implement a pedestrian only stage at the junction – this means all traffic lights will be held on red to road users to allow pedestrians to cross the junction safely.
    Provide advanced stop lines marked on each arm of the junction to benefit cyclists.
    Remove the guard rails, kerb build outs and the zebra crossing as the new traffic lights will provide a safer crossing facility.

    Please sign in to vote.
  • Tower Hamlets Local Infrastructure Fund consultation

    Created by Alex Jenkins // 1 thread

    The council is consulting on the Local Infrastructure Fund (LIF) to give local people a say in defining the infrastructure priorities for their areas.

    The consultation period will run for six weeks from 27 June 2017 to 8 August 2017.

    Tower Hamlets has grown rapidly in recent years, and a number of new housing and employment developments have been built across the borough. Additional growth is expected in the future and the council recognises that this can put pressure on local services and infrastructure - that is, on areas like transport, schools, healthcare facilities and parks/open spaces.

    To deal with the impacts, developers are required to pay a financial contribution called the Community Infrastructure Levy (CIL). The borough has apportioned to each LIF Area, 25 per cent of the money from which the income was generated. Please refer to the LIF Area Profile documents for the specific amounts collected so far for each LIF Area. The council must then use this money to support the development of the local area, by addressing the demands that development places on the area, and by making sure the right infrastructure and services are in place for residents.

    In addition to understanding local people’s infrastructure priorities, the council is engaging with local people and giving them an opportunity to nominate projects that they would like to see delivered in their neighborhood. These can be new or existing projects already identified by the council in the LIF Area Profiles. Prior to the allocation of funding to any project and in line with the regulations, you will need to clearly demonstrate how the project will deliver the provision, improvement, replacement, operation and/or maintenance of infrastructure or anything else that is concerned with addressing the demands that development places on an area.

    This consultation provides local people with an opportunity to nominate up to three (new or existing) projects. Prior to the allocation of the funding to any project and in line with the regulations it will need to be clearly demonstrated how the project will deliver the provision, improvement, replacement, operation or maintenance of infrastructure or provides anything else that is concerned with addressing the demands that development places on an area.

    Please sign in to vote.
  • TfL Proposals for Shoreditch High Street between Hackney Road and New Inn Yard

    Natalie G // 1 thread

    Junction of Shoreditch High Street with Rivington Street and Calvert Avenue:

    The following measures would make it safer and more comfortable for cyclists to travel east-west through this staggered junction across Shoreditch High Street:

    We would introduce a right-turn ban for all traffic except cycles exiting Rivington Street into Shoreditch High Street. This would improve safety for cyclists waiting to turn into Rivington Street and pedestrians using the nearby pedestrian crossing. Our latest traffic counts show a maximum of 33 vehicles per hour making this right turn, and we are satisfied alternative routes exist
    We would remove a southbound general traffic lane on Shoreditch High Street to accommodate two new right-turn pockets and three new traffic islands. The traffic islands would protect road users waiting to turn right into either Rivington Street (cycles only) or Calvert Avenue (all traffic)
    We would reduce the size of the footway by a small amount on the northern corner of Shoreditch High Street and Calvert Avenue to accommodate the turning movements of larger vehicles once the new traffic islands are in place
    Junction of Shoreditch High Street and Hackney Road:

    We would enlarge the traffic island to the west of the southbound slip road, reducing the carriageway width and the number of southbound lanes from two to one. This would create more footway space for pedestrians and reduce the distance people have to cross. Making this section of road a single lane for motor traffic would also create space for an advisory southbound cycle lane and reduce the likelihood of conflict between cyclists and motor traffic
    Shoreditch High Street:

    We would install a new southbound bus lane (operational Monday to Saturday, 7am to 7pm) in place of a general traffic lane from south of Rivington Street to the pedestrian crossing opposite New Inn Yard. This bus lane would also be available to cycles, taxis, motorcycles and coaches. The loading bay outside the Ace Hotel, and the existing bus stand and bus stops on Shoreditch High Street would not be affected by the bus lane

    Please sign in to vote.
  • Bromley-by-Bow and Marshgate Lane

    Created by Simon Munk // 1 thread

    From TfL:

    Overview
    We are working with the London Boroughs of Tower Hamlets and Newham and the London Legacy Development Corporation to enhance the transport links and public realm at Bromley-by-Bow and Marshgate Lane. The proposals would make it easier for people to cross both the A12 and Stratford High Street by providing new or upgraded pedestrian and cycle facilities, improving access for vehicles, enabling new bus routings, encouraging more walking and cycling, and connecting local communities and new developments in the surrounding area.

    What are we proposing?
    We would like your views on our initial ideas to change the road layout at Bromley-by-Bow and Marshgate Lane.

    Bromley-by-Bow
    Two signalised junctions on the A12, to the north of Bromley-by-Bow station, would provide access to proposed residential and commercial development to the east of the A12
    Vehicles travelling northbound on the A12 would be able to turn right to access these new developments directly, without having to make a u-turn at Bow roundabout
    A bus-only link across the A12 would connect Bromley-by-Bow and new developments to the east
    Signalised crossings, replacing the existing subway at Three Mill Lane, and improvements to the subway at Bromley-by-Bow station would make crossing the A12 easier and more accessible for pedestrians and cyclists
    The proposals would also give west Bromley-by-Bow better links to the open space around the River Lea, the Lea River Park & Leaway, and the Three Mills historic buildings and park
    A segregated cycle track on the east side of the A12 would help improve access to the local cycle network, including the Lea Valley Towpath and Cycle Superhighway 2

    Marshgate Lane
    A new link road, connecting Marshgate Lane with Sugarhouse Lane and creating a four-arm junction with A118 Stratford High Street, would allow buses, cyclists and pedestrians to cross the Bow Back River via a new bridge, improving access to Pudding Mill Lane station and the Queen Elizabeth Olympic Park

    Enabling future bus changes
    In addition to making the area more accessible for pedestrians and cyclists, the proposals for Bromley-by-Bow and Marshgate Lane would enable the creation of a new bus link. This would run from the west of the A12 at Bromley-by-Bow, through new developments either side of the River Lea, and north to the Queen Elizabeth Olympic Park. Any potential changes to bus routes in the area would be subject to a future and separate consultation.

    Traffic impacts
    Should we decide to take the proposals forward to the next stage of design, we would undertake traffic modelling to understand any potential effects of the changes, and summarises the results as part of a further stage of consultation on detailed proposals.

    Why are we proposing this?
    Bow and the wider area are changing. Local regeneration, growth in housing and the legacy development of the Queen Elizabeth Olympic Park are all expected to contribute to changing demands on the transport network. Our key aims for the area are:

    Making the A12 Blackwall Tunnel Northern Approach easier to cross. People prefer being able to cross streets at their convenience. Fast-moving or heavy traffic can make this difficult
    Supporting growth and local businesses by providing better access to new developments, encouraging more walking and cycling, and connecting communities
    Creating a more liveable place. People are more likely to use our streets when their journey is interesting and stimulating, with attractive views, buildings, planting, and where other people are using the street

    Bow Interchange
    In spring 2015 we consulted on improvements to make it easier for pedestrians to cross Bow Interchange safely and provide a new area of public space. Seven new signalised crossings, including two pedestrian/cycle crossings, were opened in June 2016, improving connectivity between Bow and Stratford. You can find more information on the 2015 consultation at: tfl.gov.uk/roads/bow-vision

    We have looked at further options to redesign Bow Interchange and remove both the roundabout and flyover, giving pedestrians and cyclists more direct access to facilities. However, we have now deferred development of this scheme until we can identify the significant funding required to take the plans forward.

    Public exhibitions
    We will be holding the following public exhibitions, where you can view the proposals, speak to members of the project team and submit your response to the consultation:

    Kingsley Hall, Powis Road, London E3 3HJ

    TBC
    Saturday 8 April, 1200-1600
    Thursday 20 April, 1600-2000

    The Vision for Bow and the Healthy Streets Approach
    The pedestrian improvements at Bow Interchange were delivered as part of the Vision for Bow: a place which all road users, passing through, find accessible, safe and connected. You can find more information on the Vision for Bow at tfl.gov.uk/roads/bow-vision

    Announced in February 2017, the Healthy Streets Approach incorporates the objectives and principles of the Vision for Bow. We will therefore deliver the proposals at Bromley-by-Bow and Marshgate Lane as part of this approach, which sets out a long-term plan for improving Londoners’ and visitors’ experiences of our streets, helping everyone to be more active and enjoy the health benefits of being on our streets. You can find more information on the Healthy Streets Approach at tfl.gov.uk/healthy-streets

    Other developments in the Bow area
    The overview map above includes proposals for road layout changes in the Bow area that would be delivered by organisations other than Transport for London. We have included these to show how our proposals fit in to the wider regeneration of the Bow area. These changes are included in the Bromley-by-Bow and Pudding Mill Supplementary Planning Documents, which were consulted on by the London Legacy Development Corporation (LLDC) in winter 2016. Details of these consultations can be found below.

    Please sign in to vote.
  • Monier Road H14 Olympic Park bridge

    Created by Simon Munk // 2 threads

    This is a motor vehicle bridge planned to replace the current cycle/walking bridge from Fish Island to the Olympic Park.

    LLDC said:

    "Bridges H14 and H16 both span the River Lee Navigation and will connect Fish Island to the Sweetwater neighbourhood planned within PDZ4. Under the LCS permission, outline approval was granted for:
    - Bridge H14: A new all-modes bridge (including a vehicular route) connecting Sweetwater to Roach Road/Monier Road.
    - Bridge H16: A new pedestrian and cycle bridge connecting Sweetwater to Stour Road.

    The new all-modes H14 will replace the existing pedestrian and cycle bridge that currently crosses the River Lee Navigation at the same location.
    Condition LCS0.31 of the LCS outline planning permission specifies the information to be provided with RMAs for both Bridges H14 and H16. Table A1 in Appendix A to this Covering
    Letter details how the requirements of Condition LCS0.31 have been met. Appendix A also notes any other relevant LCS planning conditions (Table A2) that are addressed by the RMAs.
    The description of development for the purposes of the Bridge H14 RMA is as follows: “Application for the approval of reserved matters for Bridge H14 with associated works pursuant to condition LCS0.31 of outline planning permission 11/90621/OUTODA being details of layout, scale, appearance, means of access and landscape.”
    The description of development for the purposes of the Bridge H16 RMA is as follows: “Application for the approval of reserved matters for Bridge H16 with associated works pursuant to condition LCS0.31 of outline planning permission 11/90621/OUTODA being details of layout, scale, appearance, means of access and landscape.”

    Please sign in to vote.

532 threads found for 'consultation':

No planning applications found for 'consultation'.

Back to top