  • Antill Road area

    Created by Alex Jenkins // 1 thread

    Tower Hamlets Council is consulting people in the Antill Road area on proposed speed-reducing measures to support the 20mph scheme.

    The proposal supports the London Mayor’s “Safe Streets for London” strategy, and the Council’s commitment to reduce the number of collisions and injuries on London’s roads, as well as make the streets better places to walk and cycle.

    https://www.pclconsult.co.uk/projects/antill-road-area/
    Deadline: 23 July 2017

    Please sign in to vote.
  • Ben Jonson Road / Harford Street / Aston Street junction

    Created by Alex Jenkins // 1 thread

    CONSULTATION RUBRIC:

    Three collisions have occurred at the Ben Jonson/Harford Street/Aston Street junction over a three year period resulting in three slight collisions including a pedestrian hit on the zebra crossing.

    Improving road user behaviour is key to reducing collisions and although changes in layout can’t fully resolve this, redesign of our streets can help.

    The Ben Jonson/Harford Street/Aston Street junction is currently being invested in to improve the safety of the junction and the environment you live in.

    We propose to:

    Introduce traffic lights at the existing give-way junction to make it safer for pedestrians to cross.
    Implement a pedestrian only stage at the junction – this means all traffic lights will be held on red to road users to allow pedestrians to cross the junction safely.
    Remove the zebra crossing as the new traffic lights will provide a safer crossing facility.

    https://www.pclconsult.co.uk/projects/stepney-way-and-sidney-street-junction-2/

    Please sign in to vote.
  • Stepney Way and Sidney Street junction

    Created by Alex Jenkins // 1 thread

    CONSULTATION RUBRIC:

    Three collisions have occurred at the Stepney Way / Sidney Street junction over a three year period causing four slight injuries. All three collisions occurred due to failing to look properly when turning out of the junction or hitting a vehicle in front.

    Improving road user behaviour is key to reducing collisions and although changes in layout can’t fully resolve this, redesign of our streets can help.

    The Stepney Way/Sidney Street junction is currently being invested in to improve the safety of the junction and the environment you live in.

    We propose to:

    Introduce traffic lights at the existing give-way junction to make it safer for pedestrians to cross.
    Implement a pedestrian only stage at the junction – this means all traffic lights will be held on red to road users to allow pedestrians to cross the junction safely.
    Provide advanced stop lines marked on each arm of the junction to benefit cyclists.
    Remove the guard rails, kerb build outs and the zebra crossing as the new traffic lights will provide a safer crossing facility.

    Please sign in to vote.
  • Rumble strips instead of paint

    Created by Simon here // 2 threads

    Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?

    Please sign in to vote.
  • Tower Hamlets Local Infrastructure Fund consultation

    Created by Alex Jenkins // 1 thread

    The council is consulting on the Local Infrastructure Fund (LIF) to give local people a say in defining the infrastructure priorities for their areas.

    The consultation period will run for six weeks from 27 June 2017 to 8 August 2017.

    Tower Hamlets has grown rapidly in recent years, and a number of new housing and employment developments have been built across the borough. Additional growth is expected in the future and the council recognises that this can put pressure on local services and infrastructure - that is, on areas like transport, schools, healthcare facilities and parks/open spaces.

    To deal with the impacts, developers are required to pay a financial contribution called the Community Infrastructure Levy (CIL). The borough has apportioned to each LIF Area, 25 per cent of the money from which the income was generated. Please refer to the LIF Area Profile documents for the specific amounts collected so far for each LIF Area. The council must then use this money to support the development of the local area, by addressing the demands that development places on the area, and by making sure the right infrastructure and services are in place for residents.

    In addition to understanding local people’s infrastructure priorities, the council is engaging with local people and giving them an opportunity to nominate projects that they would like to see delivered in their neighborhood. These can be new or existing projects already identified by the council in the LIF Area Profiles. Prior to the allocation of funding to any project and in line with the regulations, you will need to clearly demonstrate how the project will deliver the provision, improvement, replacement, operation and/or maintenance of infrastructure or anything else that is concerned with addressing the demands that development places on an area.

    This consultation provides local people with an opportunity to nominate up to three (new or existing) projects. Prior to the allocation of the funding to any project and in line with the regulations it will need to be clearly demonstrated how the project will deliver the provision, improvement, replacement, operation or maintenance of infrastructure or provides anything else that is concerned with addressing the demands that development places on an area.

    Please sign in to vote.
  • Mayor's Transport Strategy

    Draft Mayor's Transport Strategy 2017
    On June 21 Mayor of London, Sadiq Khan, published a draft of the Mayor's Transport Strategy. The document sets out the Mayor’s policies and proposals to reshape transport in London over the next 25 years.

    About the strategy

    Transport has the potential to shape London, from the streets Londoners live, work and spend time on, to the Tube, rail and bus services they use every day.

    By using the Healthy Streets Approach to prioritise human health and experience in planning the city, the Mayor wants to change London’s transport mix so the city works better for everyone.

    Three key themes are at the heart of the strategy.

    1. Healthy Streets and healthy people
    Creating streets and street networks that encourage walking, cycling and public transport use will reduce car dependency and the health problems it creates.

    2. A good public transport experience
    Public transport is the most efficient way for people to travel over distances that are too long to walk or cycle, and a shift from private car to public transport could dramatically reduce the number of vehicles on London’s streets.

    3. New homes and jobs
    More people than ever want to live and work in London. Planning the city around walking, cycling and public transport use will unlock growth in new areas and ensure that London grows in a way that benefits everyone.

    Please sign in to vote.
  • Thames bridges counter-terrorism barriers

    Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.

    LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.

    Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.

    Please sign in to vote.
  • TfL Proposals for Shoreditch High Street between Hackney Road and New Inn Yard

    Junction of Shoreditch High Street with Rivington Street and Calvert Avenue:

    The following measures would make it safer and more comfortable for cyclists to travel east-west through this staggered junction across Shoreditch High Street:

    We would introduce a right-turn ban for all traffic except cycles exiting Rivington Street into Shoreditch High Street. This would improve safety for cyclists waiting to turn into Rivington Street and pedestrians using the nearby pedestrian crossing. Our latest traffic counts show a maximum of 33 vehicles per hour making this right turn, and we are satisfied alternative routes exist
    We would remove a southbound general traffic lane on Shoreditch High Street to accommodate two new right-turn pockets and three new traffic islands. The traffic islands would protect road users waiting to turn right into either Rivington Street (cycles only) or Calvert Avenue (all traffic)
    We would reduce the size of the footway by a small amount on the northern corner of Shoreditch High Street and Calvert Avenue to accommodate the turning movements of larger vehicles once the new traffic islands are in place
    Junction of Shoreditch High Street and Hackney Road:

    We would enlarge the traffic island to the west of the southbound slip road, reducing the carriageway width and the number of southbound lanes from two to one. This would create more footway space for pedestrians and reduce the distance people have to cross. Making this section of road a single lane for motor traffic would also create space for an advisory southbound cycle lane and reduce the likelihood of conflict between cyclists and motor traffic
    Shoreditch High Street:

    We would install a new southbound bus lane (operational Monday to Saturday, 7am to 7pm) in place of a general traffic lane from south of Rivington Street to the pedestrian crossing opposite New Inn Yard. This bus lane would also be available to cycles, taxis, motorcycles and coaches. The loading bay outside the Ace Hotel, and the existing bus stand and bus stops on Shoreditch High Street would not be affected by the bus lane

    Please sign in to vote.
  • Bromley-by-Bow and Marshgate Lane

    From TfL:

    Overview
    We are working with the London Boroughs of Tower Hamlets and Newham and the London Legacy Development Corporation to enhance the transport links and public realm at Bromley-by-Bow and Marshgate Lane. The proposals would make it easier for people to cross both the A12 and Stratford High Street by providing new or upgraded pedestrian and cycle facilities, improving access for vehicles, enabling new bus routings, encouraging more walking and cycling, and connecting local communities and new developments in the surrounding area.

    What are we proposing?
    We would like your views on our initial ideas to change the road layout at Bromley-by-Bow and Marshgate Lane.

    Bromley-by-Bow
    Two signalised junctions on the A12, to the north of Bromley-by-Bow station, would provide access to proposed residential and commercial development to the east of the A12
    Vehicles travelling northbound on the A12 would be able to turn right to access these new developments directly, without having to make a u-turn at Bow roundabout
    A bus-only link across the A12 would connect Bromley-by-Bow and new developments to the east
    Signalised crossings, replacing the existing subway at Three Mill Lane, and improvements to the subway at Bromley-by-Bow station would make crossing the A12 easier and more accessible for pedestrians and cyclists
    The proposals would also give west Bromley-by-Bow better links to the open space around the River Lea, the Lea River Park & Leaway, and the Three Mills historic buildings and park
    A segregated cycle track on the east side of the A12 would help improve access to the local cycle network, including the Lea Valley Towpath and Cycle Superhighway 2

    Marshgate Lane
    A new link road, connecting Marshgate Lane with Sugarhouse Lane and creating a four-arm junction with A118 Stratford High Street, would allow buses, cyclists and pedestrians to cross the Bow Back River via a new bridge, improving access to Pudding Mill Lane station and the Queen Elizabeth Olympic Park

    Enabling future bus changes
    In addition to making the area more accessible for pedestrians and cyclists, the proposals for Bromley-by-Bow and Marshgate Lane would enable the creation of a new bus link. This would run from the west of the A12 at Bromley-by-Bow, through new developments either side of the River Lea, and north to the Queen Elizabeth Olympic Park. Any potential changes to bus routes in the area would be subject to a future and separate consultation.

    Traffic impacts
    Should we decide to take the proposals forward to the next stage of design, we would undertake traffic modelling to understand any potential effects of the changes, and summarises the results as part of a further stage of consultation on detailed proposals.

    Why are we proposing this?
    Bow and the wider area are changing. Local regeneration, growth in housing and the legacy development of the Queen Elizabeth Olympic Park are all expected to contribute to changing demands on the transport network. Our key aims for the area are:

    Making the A12 Blackwall Tunnel Northern Approach easier to cross. People prefer being able to cross streets at their convenience. Fast-moving or heavy traffic can make this difficult
    Supporting growth and local businesses by providing better access to new developments, encouraging more walking and cycling, and connecting communities
    Creating a more liveable place. People are more likely to use our streets when their journey is interesting and stimulating, with attractive views, buildings, planting, and where other people are using the street

    Bow Interchange
    In spring 2015 we consulted on improvements to make it easier for pedestrians to cross Bow Interchange safely and provide a new area of public space. Seven new signalised crossings, including two pedestrian/cycle crossings, were opened in June 2016, improving connectivity between Bow and Stratford. You can find more information on the 2015 consultation at: tfl.gov.uk/roads/bow-vision

    We have looked at further options to redesign Bow Interchange and remove both the roundabout and flyover, giving pedestrians and cyclists more direct access to facilities. However, we have now deferred development of this scheme until we can identify the significant funding required to take the plans forward.

    Public exhibitions
    We will be holding the following public exhibitions, where you can view the proposals, speak to members of the project team and submit your response to the consultation:

    Kingsley Hall, Powis Road, London E3 3HJ

    TBC
    Saturday 8 April, 1200-1600
    Thursday 20 April, 1600-2000

    The Vision for Bow and the Healthy Streets Approach
    The pedestrian improvements at Bow Interchange were delivered as part of the Vision for Bow: a place which all road users, passing through, find accessible, safe and connected. You can find more information on the Vision for Bow at tfl.gov.uk/roads/bow-vision

    Announced in February 2017, the Healthy Streets Approach incorporates the objectives and principles of the Vision for Bow. We will therefore deliver the proposals at Bromley-by-Bow and Marshgate Lane as part of this approach, which sets out a long-term plan for improving Londoners’ and visitors’ experiences of our streets, helping everyone to be more active and enjoy the health benefits of being on our streets. You can find more information on the Healthy Streets Approach at tfl.gov.uk/healthy-streets

    Other developments in the Bow area
    The overview map above includes proposals for road layout changes in the Bow area that would be delivered by organisations other than Transport for London. We have included these to show how our proposals fit in to the wider regeneration of the Bow area. These changes are included in the Bromley-by-Bow and Pudding Mill Supplementary Planning Documents, which were consulted on by the London Legacy Development Corporation (LLDC) in winter 2016. Details of these consultations can be found below.

    Please sign in to vote.
  • Monier Road H14 Olympic Park bridge

    Created by Simon Munk // 2 threads

    This is a motor vehicle bridge planned to replace the current cycle/walking bridge from Fish Island to the Olympic Park.

    LLDC said:

    "Bridges H14 and H16 both span the River Lee Navigation and will connect Fish Island to the Sweetwater neighbourhood planned within PDZ4. Under the LCS permission, outline approval was granted for:
    - Bridge H14: A new all-modes bridge (including a vehicular route) connecting Sweetwater to Roach Road/Monier Road.
    - Bridge H16: A new pedestrian and cycle bridge connecting Sweetwater to Stour Road.

    The new all-modes H14 will replace the existing pedestrian and cycle bridge that currently crosses the River Lee Navigation at the same location.
    Condition LCS0.31 of the LCS outline planning permission specifies the information to be provided with RMAs for both Bridges H14 and H16. Table A1 in Appendix A to this Covering
    Letter details how the requirements of Condition LCS0.31 have been met. Appendix A also notes any other relevant LCS planning conditions (Table A2) that are addressed by the RMAs.
    The description of development for the purposes of the Bridge H14 RMA is as follows: “Application for the approval of reserved matters for Bridge H14 with associated works pursuant to condition LCS0.31 of outline planning permission 11/90621/OUTODA being details of layout, scale, appearance, means of access and landscape.”
    The description of development for the purposes of the Bridge H16 RMA is as follows: “Application for the approval of reserved matters for Bridge H16 with associated works pursuant to condition LCS0.31 of outline planning permission 11/90621/OUTODA being details of layout, scale, appearance, means of access and landscape.”

    Please sign in to vote.
  • London Assembly Transport Committee Bus network design, safety

    London Assembly said:
    "Buses are the busiest form of public transport in London. The city has 675 bus routes, with around 9,000 buses in operation and over 19,000 bus stops. Approximately 2.5 billion bus passenger trips are made every year, around double the number made on London Underground.
    "TfL commissions private operators to run bus services in London, awarding seven-year contracts to operate bus routes. Although bus safety (in terms of casualty numbers) has improved over recent years, there was a spike in bus collision fatalities in 2015.
    "The London Assembly Transport Committee is investigating two aspects of bus services in London: Network Design and Safety."

    Please sign in to vote.
  • Wick Lane Quietway route consultation

    Created by Owen Pearson // 1 thread

    Wick Lane Quietway cycle route from Greenway to Quietway 6

    Transport for London (TfL) is proposing to improve provision for cyclists along Wick Lane from Jodrell Road/Cadogan Terrace to the Greenway and has asked the council to help to deliver the scheme in this area as part of the Quietway cycle network.

    Scheme drawings: http://www.towerhamlets.gov.uk/Documents/Transport-and-infrastructure/Transport-planning/QWNG_Consultation.pdf
    Overall Quietway 6 route: http://www.towerhamlets.gov.uk/Documents/Transport-and-infrastructure/Transport-planning/QW_Newham_Greenway_Map.pdf

    Please sign in to vote.
  • A13 Commercial Road between New Road and Jubilee Street

    Created by Simon Munk // 1 thread

    TfL Overview:
    We would like your views on proposals to improve safety, journey time reliability and the urban realm on Commercial Road between New Road and Jubilee Street in the London Borough of Tower Hamlets.
    We have identified a higher rate of collisions along this stretch of road compared to similar roads in London, particularly involving pedestrians, cyclists and motorcyclists. Therefore, we are proposing a scheme that is designed to reduce the number of collisions involving these vulnerable road users.
    The area also suffers from vehicle congestion, particularly at peak times. Parked vehicles prevent buses from using the eastbound bus lane at busy times, which causes delays to bus passengers.

    What are we proposing?
    We are proposing to implement a number of changes to improve conditions for bus passengers and vulnerable road users. These include:

    Pedestrians
    - Raised carriageway with coloured surfacing on Commercial Road between Turner Street and Sidney Street to help lower traffic speeds and reduce collisions. There would still be a detectable kerb height between the road and the footway
    - Converting the pedestrian crossing outside Watney Market to a wider straight crossing and relocating it closer to the market. This would mean pedestrians crossing in one stage rather than waiting on a central island. Pedestrian “Countdown” at the crossing would also be provided.
    - Providing a wider crossing point for schoolchildren outside Mulberry School for Girls and installing electronic signs to make drivers more aware of schoolchildren crossing
    - Raising the level of all side road entrances and providing kerb build outs to reduce traffic speeds, making it easier for pedestrians to cross
    - Providing a continuous footway across the following side roads to give priority to pedestrians and a smoother crossing surface: Richard Street; Jane Street; Anthony Street; Fenton Street; Buross Street; Hungerford Street; Bromehead Street
    - Reducing kerb heights, particularly around Watney Market, to help pedestrians
    - Installing low level central islands to help pedestrians cross the road informally
    - Upgrading pavements where damaged or uneven

    Other Road Users
    - Re-surfacing sections of the road to provide a smoother surface for cyclists and motorcyclists and to reduce noise
    - Making Turner Street “no entry” to motor traffic (except cycles) from Commercial Road in order to improve safety outside Mulberry School for Girls and to prevent vehicles queuing back onto Commercial Road at busy times. Access would still be possible using other routes, and motorists would be able to exit Turner Street onto Commercial Road as they do now
    - Widening bus lanes to 4.5 metres to allow cyclists and motorcyclists to pass buses more safely. We would create space for this by changing the hours of operation of the parking bays on the North side of Commercial Road
    - Converting some existing parking bays into two new loading bays.
    - Changing parking controls where necessary on the north side of Commercial Road by converting existing ‘all day’ parking (Mon-Sat 7am-7pm) to off-peak times (Mon-Sat 10am-4pm). This would allow the bus lane to operate at peak times (Mon-Sat 7-10am and 4-7pm)
    - Providing Advanced Stop Lines for cyclists at junctions to let them wait ahead of other traffic

    Urban Realm Improvements
    - New tree planting where conditions allow.
    - Improving the urban realm – reducing clutter, better paving and a more pleasant environment particularly around Watney Market

    Please sign in to vote.
  • Traffic changes proposed for Cable Street, CS3 and area

    Created by Simon Munk // 1 thread

    The council is consulting with the public about making changes to traffic movements in and around Cable Street.
    The proposed changes are designed to alleviate the number of vehicles cutting through Cable Street to avoid congestion on The Highway.
    There are a number of vehicles using Brodlove Lane and Cable Street as a ‘rat run’ to travel from The Highway to Butcher Row.
    The changes to be considered by the public include one-way parts of Cable Street.
    It is also proposed that a number of measures be introduced to make the area safer for pedestrians and cyclists.
    A new bus lane will be created on a short section of Cable Street between Sutton Street and Watney Street. This will be supported by the closure of the north end of King David Lane to all motor vehicles.
    The changes will see a significant reduction in the amount and speeds of traffic using Cable Street and surrounding roads.
    In preliminary consultation with businesses and residents, the council was told cyclists are uncomfortable using the narrow two-way cycle lane.
    The council proposes the cycle lane be widened for cyclists travelling against the traffic, with cyclists travelling the other way joining the main flow of reduced traffic.
    The area between Shadwell Overground and DLR stations and Sutton Street will be completely redesigned to ensure priority for pedestrians.
    The proposals will also see the introduction of pocket parks and improved community spaces to make the area look and feel more attractive.
    Mayor of Tower Hamlets, John Biggs, said: “We have developed these proposals after being made aware of initial concerns from residents, businesses and people who travel through the area. These detailed and well developed plans will improve the area for all road users. We welcome any comments to ensure that we have taken everything into consideration.”
    Cllr Ayas Miah, cabinet member for environment, added: “For far too long the safety of people using Cable Street has not been given enough priority. These proposed changes will stop vehicles from cutting through the area for the benefit of pedestrians and cyclists. The aesthetic changes proposed will enable all local people to be proud of the area that they live or work in.”
    Full details of the proposals are being sent to 5,000 addresses along Cable Street and in the surrounding area.

    Please sign in to vote.
  • Tower Bridge road surface

    Created by londoncycler // 1 thread

    On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?

    Please sign in to vote.
  • Progressing the LCC 2014 election campaign 'asks'

    Created by George Coulouris // 7 threads

    This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:

    1. Safe routes to schools
    2. Areas without through motor traffic (AWTTs)
    3. Protected space on main roads/major junctions
    4. Safe cycle routes via parks and canals (Greenways)
    5. 20mph speed limits
    6. Liveable town centres

    so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.

    Please sign in to vote.
  • TfL Consultation: Further safety improvements at Bow roundabout

    Created by Shaun McDonald // 1 thread

    Further safety improvements at Bow roundabout
    Overview
    Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions.

    Why We Are Consulting
    As part of this work, we have developed proposals to further improve safety at Bow roundabout.

    What we’re proposing and why

    Bow roundabout is a key junction for cyclists travelling between central and east London.

    Cycle Early Start
    A cycle early-start would operate at the traffic signals on the westbound approach to Bow roundabout.

    This would provide a dedicated green light to allow cyclists to wait ahead of other traffic before moving onto the roundabout.

    A new mandatory cycle lane on the westbound approach would allow cyclists to get to the roundabout entrance without having to filter through traffic.

    The early-start area would be 18 metres deep, so there's a clear space for cyclists in front of any traffic.

    This cycle early-start would improve safety, due to the reduced risk of conflict between cyclists travelling straight ahead and vehicles turning left. It would also provide a quick and direct route through the roundabout for cyclists.

    The eastbound early-start was completed in June 2012. Our provisional monitoring to date shows that the eastbound early-start has been effective in reducing the left turning conflict risk that it was designed to address. It also shows that the cycle lane on the approach is well-used, with significantly fewer cyclists using the footway than before. We will continue to monitor and analyse the operation of these facilities.

    Cycle Bus Stop By-Pass
    TfL is proposing to introduce a new cycle lane around the back of the bus stop on the approach to the roundabout to help cyclists get ahead of other traffic and reduce the risk of conflict between cyclists and buses pulling in and out of the bus stop.

    To accommodate the new cycle lane, the bus lay by would be filled in so buses would stop on the carriageway instead. .

    Please click here to see the map for further information on the proposals.

    We continue to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Bow area.

    We intend to begin work at the roundabout in January 2013. We’ll write to residents and businesses nearer the time to advise on the timing and impact of construction work.

    https://consultations.tfl.gov.uk/betterjunctions/bow_roundabout/consult_view

    Please sign in to vote.
  • TfL Consultation: Proposed improvements at the junction of Mile End Road and Burdett Road

    Created by Shaun McDonald // 1 thread

    Overview
    Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions. As part of this work, we have developed proposals to improve conditions for pedestrians and cyclists at the junction of Mile End Road and Burdett Road.

    Why We Are Consulting
    About the proposed changes:

    Our review of the current junction layout showed that there is an above average level of collisions involving pedestrians and cyclists coming into conflict with turning vehicles.

    The proposed improvements are shown on the attached plan and include:

    Removal of the slip roads to reduce the potential for conflict between vehicles and cyclists.

    Reducing crossing distances and number of crossings for pedestrians

    New mandatory cycle lanes on Mile End Road and Grove Road to allow cyclists easier access to the advanced stop line.

    Increased cycle parking around the junction.

    Wider traffic islands, new trees and levelled footways.

    New street lighting system to be combined with traffic signals to create more space on the footways.

    To incorporate the above benefits, we will also need to change the traffic lights operation to allow vehicles to exit Grove Road and Burdett Road at the same time.

    Please click here to view the map for further information on our proposals. We plan to begin works in early 2013.

    How to comment on the proposals:

    Please give us your views by completing the online consultation form below. You can also contact TfL’s Consultation Team at: STengagement@tfl.gov.uk. Please let us know your views by 10 December 2012

    About the Better Junctions programme:

    TfL is making it easier and safer for people to cycle in London. As part of this work, we’re meeting with a number of different organisations to review and improve junctions on the Barclays Cycle Superhighways and the Transport for London Road Network (TLRN). We’re planning a variety of improvements, ranging from initial upgrades at some locations, to more substantial and innovative redevelopment at others. Please see www.tfl.gov.uk/betterjunctions for more information.

    https://consultations.tfl.gov.uk/betterjunctions/mileendburdett

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas: