Cotall Street Consultation: proposed road closure and relandscaping
Proposed new landscaping to pedestrianise part of Cotall Street and connect the Limehouse Cut Towpath to the Bartlett Park. This includes the removal of existing parking bays, railings, and part of the towpath wall. The introduction of steps and a ramp to access to the towpath, a small pontoon, cycle parking, and new planting.
Cotall Street and Canal Wall, London
Tower Hamlets
Application reference : PA/17/02841/NC